{"id":5650,"date":"2020-04-30T16:25:06","date_gmt":"2020-04-30T06:25:06","guid":{"rendered":"https:\/\/www.clenergy.com\/?post_type=media_press_releases&#038;p=5650"},"modified":"2025-05-16T14:03:19","modified_gmt":"2025-05-16T04:03:19","slug":"clenergy-japan-18mw-solar-park-connected-to-the-grid","status":"publish","type":"media_press_releases","link":"https:\/\/www.clenergy.com\/media-press-release\/clenergy-japan-18mw-solar-park-connected-to-the-grid\/","title":{"rendered":"Clenergy Japan-18MW Solar Park Connected to the Grid"},"content":{"rendered":"<p>Within a year, Clenergy has completed another large-scale solar park. The site was secure in May 2019, located in Juocho Takahara, Hitachi-shi, Ibaraki, Japan. The project was complex and in the end we chose to use the\u00a0<a href=\"https:\/\/www.clenergy.co.jp\/downloads\/pvezrack-product-catalogue\/\" target=\"_blank\" rel=\"noopener noreferrer\">Clenergy PV-ezRack SolarTerrace II-A<\/a>\u00a0for this solar project, with our new type of rail PV-ezRack T-rail PRO 100, which is made of a stronger alloy as compared to its predecessor.<\/p>\n<p>The PV-ezRack SolarTerrace II-A is a pre-assembled ground mounting system manufactured based on our relentless drive towards innovation around fastening solar modules. It is ideal for commercial and utility-scale installations and allows both landscape and portrait orientations.<\/p>\n<p>\u201cClenergy PV-ezRack SolarTerrace II-A ground mounting system sees wide applications in the Japanese renewable energy market. Thus far, this mounting solution has been used for many large-scale solar power parks in Japan, such as Osaki Solar Park, Kimitsu Solar Park, Miyako Solar Park, just to name a few. This milestone reflects the hard work and dedication of the local Yokohama team, and we expect this momentum to continue throughout 2020 to 2021. We are proud to be a part of building the future of sustainable energy in Japan.\u201d, said Taka Ihara, CTO of Clenergy.<\/p>\n<p>Why is this ground mounting system so popular?<\/p>\n<p><strong>Benefit #1<\/strong><br \/>\n<strong>Strong Corrosion Resistance &amp; Long Service Life<\/strong><br \/>\nThe main components of PV-ezRack SolarTerrace II-A are manufactured using high-quality industry-grade AL6005 aluminium alloy, which ensures strong corrosion resistance and long service life.<\/p>\n<p><strong>Benefit #2<\/strong><br \/>\n<strong>Large Adjustable Range &amp; Great Adaptability<\/strong><br \/>\nPV-ezRack SolarTerrace II-A features a large adjustable range with adaptability to almost every direction, enabling it to withstand and accommodate tough environments.<\/p>\n<p><strong>Benefit #3<\/strong><br \/>\n<strong>Reduced Costs &amp; Shorter Construction Time<\/strong><br \/>\nThanks to its single-post design, PV-ezRack SolarTerrace II-A allows for lower ramming costs and speeds up the construction. Additionally, pre-assembled components and assembly before delivery not only ensures ease of installation but also saves lots of costs and time for developers, operating companies as well as construction units.<\/p>\n<p>Mr. Daniel Hong, CEO of Clenergy commented: \u201cJapan is our second-largest market in 2019, accounting for approximately 22% of global installations. Clenergy mounting systems and solutions have been installed in over 3000 solar power stations in Japan. We are so glad another large-scale project has been connected to the grid, initiating it\u2019s commercial operation. This is a great step towards our Mission, to develop renewable energy, making the world more sustainable and cleaner. \u201d<\/p>\n<p>This solar park client has been collaborating with Clenergy for a long time, speaking highly of Clenergy when it comes to the quality, reliability of the design, and ease of installation of our solar mounting systems and solutions.<\/p>\n<p>Apart from the 18MW project, the same client has also worked with Clenergy on other large-scale projects, including a 36MW project in Kimitsu and a 24MW project in Mobara. Both solar projects are located in\u00a0the Chiba Prefecture of\u00a0Japan.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"featured_media":0,"template":"","media_press_release_project_type":[230],"media_press_release_region":[167],"media_press_release_tag":[],"class_list":["post-5650","media_press_releases","type-media_press_releases","status-publish","hentry","media_press_release_project_type-ground-mount","media_press_release_region-japan"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Clenergy Japan-18MW Solar Park Connected to the Grid<\/title>\n<meta name=\"description\" content=\"Clenergy has completed another large-scale solar park, located in Juocho Takahara, Hitachi-shi, Ibaraki, Japan.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.clenergy.com\/media-press-release\/clenergy-japan-18mw-solar-park-connected-to-the-grid\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Clenergy Japan-18MW Solar Park Connected to the Grid\" \/>\n<meta property=\"og:description\" content=\"Clenergy has completed another large-scale solar park, located in Juocho Takahara, Hitachi-shi, Ibaraki, Japan.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.clenergy.com\/media-press-release\/clenergy-japan-18mw-solar-park-connected-to-the-grid\/\" \/>\n<meta property=\"og:site_name\" content=\"Clenergy | Solar mountings | PV mountings | Solar power station\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ClenergyGlobal\/\" \/>\n<meta property=\"article:modified_time\" content=\"2025-05-16T04:03:19+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.clenergy.com\/media-press-release\/clenergy-japan-18mw-solar-park-connected-to-the-grid\/\",\"url\":\"https:\/\/www.clenergy.com\/media-press-release\/clenergy-japan-18mw-solar-park-connected-to-the-grid\/\",\"name\":\"Clenergy Japan-18MW Solar Park Connected to the Grid\",\"isPartOf\":{\"@id\":\"https:\/\/www.clenergy.com\/#website\"},\"datePublished\":\"2020-04-30T06:25:06+00:00\",\"dateModified\":\"2025-05-16T04:03:19+00:00\",\"description\":\"Clenergy has completed another large-scale solar park, located in Juocho Takahara, Hitachi-shi, Ibaraki, Japan.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.clenergy.com\/media-press-release\/clenergy-japan-18mw-solar-park-connected-to-the-grid\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.clenergy.com\/media-press-release\/clenergy-japan-18mw-solar-park-connected-to-the-grid\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.clenergy.com\/media-press-release\/clenergy-japan-18mw-solar-park-connected-to-the-grid\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.clenergy.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Media Press Releases\",\"item\":\"https:\/\/www.clenergy.com\/media-press-release\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Clenergy Japan-18MW Solar Park Connected to the Grid\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.clenergy.com\/#website\",\"url\":\"https:\/\/www.clenergy.com\/\",\"name\":\"Clenergy | Solar mountings | PV mountings | Solar power station\",\"description\":\"Built To Last\",\"publisher\":{\"@id\":\"https:\/\/www.clenergy.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.clenergy.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.clenergy.com\/#organization\",\"name\":\"Clenergy\",\"url\":\"https:\/\/www.clenergy.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.clenergy.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.clenergy.com\/wp-content\/uploads\/2022\/04\/Clenergy_Logo_Navy.png\",\"contentUrl\":\"https:\/\/www.clenergy.com\/wp-content\/uploads\/2022\/04\/Clenergy_Logo_Navy.png\",\"width\":273,\"height\":44,\"caption\":\"Clenergy\"},\"image\":{\"@id\":\"https:\/\/www.clenergy.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ClenergyGlobal\/\",\"https:\/\/www.instagram.com\/clenergyclub\/?hl=en\",\"https:\/\/www.linkedin.com\/company\/clenergy\",\"https:\/\/www.youtube.com\/channel\/UCUqNNhHSyNPWDzMW0-XSCFA\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Clenergy Japan-18MW Solar Park Connected to the Grid","description":"Clenergy has completed another large-scale solar park, located in Juocho Takahara, Hitachi-shi, Ibaraki, Japan.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.clenergy.com\/media-press-release\/clenergy-japan-18mw-solar-park-connected-to-the-grid\/","og_locale":"en_US","og_type":"article","og_title":"Clenergy Japan-18MW Solar Park Connected to the Grid","og_description":"Clenergy has completed another large-scale solar park, located in Juocho Takahara, Hitachi-shi, Ibaraki, Japan.","og_url":"https:\/\/www.clenergy.com\/media-press-release\/clenergy-japan-18mw-solar-park-connected-to-the-grid\/","og_site_name":"Clenergy | Solar mountings | PV mountings | Solar power station","article_publisher":"https:\/\/www.facebook.com\/ClenergyGlobal\/","article_modified_time":"2025-05-16T04:03:19+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.clenergy.com\/media-press-release\/clenergy-japan-18mw-solar-park-connected-to-the-grid\/","url":"https:\/\/www.clenergy.com\/media-press-release\/clenergy-japan-18mw-solar-park-connected-to-the-grid\/","name":"Clenergy Japan-18MW Solar Park Connected to the Grid","isPartOf":{"@id":"https:\/\/www.clenergy.com\/#website"},"datePublished":"2020-04-30T06:25:06+00:00","dateModified":"2025-05-16T04:03:19+00:00","description":"Clenergy has completed another large-scale solar park, located in Juocho Takahara, Hitachi-shi, Ibaraki, Japan.","breadcrumb":{"@id":"https:\/\/www.clenergy.com\/media-press-release\/clenergy-japan-18mw-solar-park-connected-to-the-grid\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.clenergy.com\/media-press-release\/clenergy-japan-18mw-solar-park-connected-to-the-grid\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.clenergy.com\/media-press-release\/clenergy-japan-18mw-solar-park-connected-to-the-grid\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.clenergy.com\/"},{"@type":"ListItem","position":2,"name":"Media Press Releases","item":"https:\/\/www.clenergy.com\/media-press-release\/"},{"@type":"ListItem","position":3,"name":"Clenergy Japan-18MW Solar Park Connected to the Grid"}]},{"@type":"WebSite","@id":"https:\/\/www.clenergy.com\/#website","url":"https:\/\/www.clenergy.com\/","name":"Clenergy | Solar mountings | PV mountings | Solar power station","description":"Built To Last","publisher":{"@id":"https:\/\/www.clenergy.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.clenergy.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.clenergy.com\/#organization","name":"Clenergy","url":"https:\/\/www.clenergy.com\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.clenergy.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.clenergy.com\/wp-content\/uploads\/2022\/04\/Clenergy_Logo_Navy.png","contentUrl":"https:\/\/www.clenergy.com\/wp-content\/uploads\/2022\/04\/Clenergy_Logo_Navy.png","width":273,"height":44,"caption":"Clenergy"},"image":{"@id":"https:\/\/www.clenergy.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ClenergyGlobal\/","https:\/\/www.instagram.com\/clenergyclub\/?hl=en","https:\/\/www.linkedin.com\/company\/clenergy","https:\/\/www.youtube.com\/channel\/UCUqNNhHSyNPWDzMW0-XSCFA"]}]}},"_links":{"self":[{"href":"https:\/\/www.clenergy.com\/wp-json\/wp\/v2\/media_press_releases\/5650","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.clenergy.com\/wp-json\/wp\/v2\/media_press_releases"}],"about":[{"href":"https:\/\/www.clenergy.com\/wp-json\/wp\/v2\/types\/media_press_releases"}],"wp:attachment":[{"href":"https:\/\/www.clenergy.com\/wp-json\/wp\/v2\/media?parent=5650"}],"wp:term":[{"taxonomy":"media_press_release_project_type","embeddable":true,"href":"https:\/\/www.clenergy.com\/wp-json\/wp\/v2\/media_press_release_project_type?post=5650"},{"taxonomy":"media_press_release_region","embeddable":true,"href":"https:\/\/www.clenergy.com\/wp-json\/wp\/v2\/media_press_release_region?post=5650"},{"taxonomy":"media_press_release_tag","embeddable":true,"href":"https:\/\/www.clenergy.com\/wp-json\/wp\/v2\/media_press_release_tag?post=5650"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}